rambase

RamBase release info - Week 48 - 2025

02.12.2025

Production: New setting in the Product (ART) application

02.12.2025

Blog post edited by Karisma Davis

Classification:  IMPORTANT

 

A new setting,Trace individually when traceable material, has been added under the Main data tab in the Product (ART) application, allowing for better traceability of parts in the Life cycle management (LCM) part list. When enabled, parts with multiple pieces in a product structure will be split into individual lines: one piece per line. This action was previously connected to the require serial number setting. When the Trace individually when traceable material setting is disabled, the total quantity of parts with multiple pieces in a product structure will appear in a single line in the Life cycle management (LCM) part list. This is the default setting of the Product (ART) application.

 

An automatic conversion on customer databases will be performed before enabling the new feature. The conversion will automatically set Trace individually when traceable material on all items that have require serial number set, so that the application functions as before.

 

 

Release date: 16 December 2025

Sales: Update to the Job order management (POD) application

01.12.2025

Blog post edited by Alberina Shala

Classification:  IMPORTANT

 

We are pleased to introduce an update to the Job order management (POD) application that enhances the handling of materials within the Job order management (POD) process. This release introduces a new, more structured alternative route for shipment of materials, aligning the process with standard Rambase logistics workflows.

 

The existing process will continue to be available, while the new option provides greater consistency and efficiency in material handling.

 

Key improvements in this release include:

  • A new material flow where the Shipping advice (CSA) is created before materials are picked and shipped

  • Integration with ordinary logistics functions for shipping and stock handling

  • A new configuration setting to enable or disable the updated workflow

  • Updated Job order management (POD) interface (Desktop and POD Mobile) with new fields and CMIs

If the new setting is not activated, the system will continue to function as before. However, users will still notice the new interface elements and minor changes in existing components.

 

These updates aim to streamline operations and improve visibility in material management within Job order management (POD) application.

 

Release date: 15 December 2025

RamBase release info - week 47 - 2025

27.11.2025

RamBase release info - week 46 - 2025

18.11.2025

RamBase release info - Week 45 - 2025

11.11.2025

RamBase release info - Week 44 - 2025

04.11.2025

Production: Enhanced serial number validation for Product units (LCM) - Conversions completed

29.10.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

Conversions have now been completed and this will be released today, one (1) day later than initially announced.

Thank you for your patience.


This update applies to your company if:

  • You are using Operations (OPR) with the Require serial number before completion checkpoint enabled, and these Operations (OPR) are included in Production structures (KITDOC).

If so, please read the included PDF, "Enhanced serial number validation for Product units (LCM)".

To make the transition easier, we offered to run a job that automatically updates all parts where Is traceable material of product unit is already turned on. These are the parts that are already included in the Life cycle management (LCM) part list. 

This offer was only available for customers who already use serial number validation in operations, with a deadline of 23 October 2025.

If you still wish to run the job, please open a ticket with the title "Late request to run job to update traceable material".


We are now providing greater flexibility in deciding when serial numbers are required for parts in production. This update introduces configurable options at multiple levels, ensuring better traceability and compliance.

 

Challenge

Previously, serial number validation might unnecessarily block production when serial numbers were not needed for every part.

Solution

The updated logic introduces layered control across multiple applications.

  • Operation (OPR) application:

            Enable Require serial number before completion checkbox to enforce serial number validation before completing a Work order operation (WOO).

  • Product (ART) application

            Use Require serial number when traceable material checkbox to set default behavior for parts in the Product unit (LCM).

  • Product unit/Life cycle management (LCM) application

            Override requirements for individual parts using the Req serialno checkbox in the Part List.

  • Production/Product structure level (KITARTOPRITM / KITDOCOPRITM)

            Enable CheckSerialnoOnParts checkbox to enforce checks during production for specific operations.

 

For an overview of the layered control and procedures, click here.

Release date: 29 October 2025

2nd Postponement: Production: Enhanced serial number validation for Product units (LCM)

28.10.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

Due to a high number of late conversion requests we are postponing this release until further notice.


This update applies to your company if:

  • You are using Operations (OPR) with the Require serial number before completion checkpoint enabled, and these Operations (OPR) are included in Production structures (KITDOC).

If so, please read the included PDF, "Enhanced serial number validation for Product units (LCM)".

To make the transition easier, we offered to run a job that automatically updates all parts where Is traceable material of product unit is already turned on. These are the parts that are already included in the Life cycle management (LCM) part list. 

This offer was only available for customers who already use serial number validation in operations, with a deadline of 23 October 2025.

If you still wish to run the job, please open a ticket with the title "Late request to run job to update traceable material".


We are now providing greater flexibility in deciding when serial numbers are required for parts in production. This update introduces configurable options at multiple levels, ensuring better traceability and compliance.

Challenge

Previously, serial number validation might unnecessarily block production when serial numbers were not needed for every part.

Solution

The updated logic introduces layered control across multiple applications.

  • Operation (OPR) application:

Enable Require serial number before completion checkbox to enforce serial number validation before completing a Work order operation (WOO).

  • Product (ART) application

Use Require serial number when traceable material checkbox to set default behavior for parts in the Product unit (LCM).

  • Product unit/Life cycle management (LCM) application

Override requirements for individual parts using the Req serialno checkbox in the Part List.

  • Production/Product structure level (KITARTOPRITM / KITDOCOPRITM)

Enable CheckSerialnoOnParts checkbox to enforce checks during production for specific operations.

 

For an overview of the layered control and procedures, click here.

Release date: Pending conversions

Significant improvement to the Payment (PAY) application.

28.10.2025

Blog post edited by Alberina Shala

Classification:  IMPORTANT

We are excited to introduce the latest update to the Payment (PAY) application! While the core functionality you rely on remains the same, this release feature brings a refreshed user interface designed to elevate your experience.

 

The highlight of this update is a new and improved overview screen, offering a cleaner, more modern, and intuitive layout. Navigating your Payment (PAY) data is now easier and more efficient, helping you focus on what matters most, without changing the way you work. 

 
Key improvements in this release include:

  • Standardized field names for greater consistency

  • A cleaner layout for improved readability

  • A better way to create a Payment (PAY), streamlining your workflow

We hope these enhancements make your experience with PAY even more seamless and productive.

Read more about the Payment (PAY) application here

Release date: 30 October 2025

RamBase release info - Week 43 - 2025

28.10.2025

Production: Enhanced serial number validation for Product units (LCM)

24.10.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

This update applies to your company if:

  • You are using Operations (OPR) with the Require serial number before completion checkpoint enabled, and these Operations (OPR) are included in Production structures (KITDOC).

If so, please read the included PDF, "Enhanced serial number validation for Product units (LCM)".

To make the transition easier, we offered to run a job that automatically updates all parts where Is traceable material of product unit is already turned on. These are the parts that are already included in the Life cycle management (LCM) part list. 

This offer was only available for customers who already use serial number validation in operations, with a deadline of 23 October 2025.

If you still wish to run the job, please open a ticket with the title "Late request to run job to update traceable material".


We are now providing greater flexibility in deciding when serial numbers are required for parts in production. This update introduces configurable options at multiple levels, ensuring better traceability and compliance.

 

Challenge

Previously, serial number validation might unnecessarily block production when serial numbers were not needed for every part.

Solution

The updated logic introduces layered control across multiple applications.

  • Operation (OPR) application:

Enable Require serial number before completion checkbox to enforce serial number validation before completing a Work order operation (WOO).

  • Product (ART) application

Use Require serial number when traceable material checkbox to set default behavior for parts in the Product unit (LCM).

  • Product unit/Life cycle management (LCM) application

Override requirements for individual parts using the Req serialno checkbox in the Part List.

  • Production/Product structure level (KITARTOPRITM / KITDOCOPRITM)

Enable CheckSerialnoOnParts checkbox to enforce checks during production for specific operations.

 

For an overview of the layered control and procedures, click here.

Release date: 28 October 2025

POSTPONED with new date - Production: Enhanced serial number validation for Product units (LCM)

20.10.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

This release has been postponed and is now scheduled for 28 October 2025, to allow time for final adjustments to be completed.

The delay will also provide time for companies who might need to adjust to the coming changes.

This update applies to your company if:

  • You are using Operations (OPR) with the Require serial number before completion checkpoint enabled, and these Operations (OPR) are included in Production structures (KITDOC).

If so, please read the included PDF, "Enhanced serial number validation for Product units (LCM)".

To make this transition easier, we can run a job that automatically updates all parts where Is traceable material of product unit is already turned on. These are the parts that are already included in the Life cycle management (LCM) part list. 

This option is available only for customers who already use serial number validation in operations.

To run the job, please open a ticket with the title "Request to run job to update traceable material".

Deadline for running the job: 23 October 2025


We are now providing greater flexibility in deciding when serial numbers are required for parts in production. This update introduces configurable options at multiple levels, ensuring better traceability and compliance.

Challenge

Previously, serial number validation might unnecessarily block production when serial numbers were not needed for every part.

Solution

The updated logic introduces layered control across multiple applications.

  • Operation (OPR) application:

Enable Require serial number before completion checkbox to enforce serial number validation before completing a Work order operation (WOO).

  • Product (ART) application

Use Require serial number when traceable material checkbox to set default behavior for parts in the Product unit (LCM).

  • Product unit/Life cycle management (LCM) application

Override requirements for individual parts using the Req serialno checkbox in the Part List.

  • Production/Product structure level (KITARTOPRITM / KITDOCOPRITM)

Enable CheckSerialnoOnParts checkbox to enforce checks during production for specific operations.

For an overview of the layered control and procedures, click here.

Release date: 28 October 2025

 

Significant improvement to the Payment (PAY) application

16.10.2025

Blog post added by Alberina Shala

Classification:  IMPORTANT

We are excited to introduce the latest update to the Payment (PAY) application! While the core functionality you rely on remains the same, this release feature brings a refreshed user interface designed to elevate your experience.

 

The highlight of this update is a new and improved overview screen, offering a cleaner, more modern, and intuitive layout. Navigating your Payment (PAY) data is now easier and more efficient, helping you focus on what matters most, without changing the way you work. 

 
Key improvements in this release include:

  • Standardized field names for greater consistency

  • A cleaner layout for improved readability

  • A better way to create a Payment (PAY), streamlining your workflow

We hope these enhancements make your experience with PAY even more seamless and productive.


Release date: 30 October 2025

RamBase release info - Week 41 - 2025

14.10.2025

Enhanced serial number validation for Product units (LCM)

08.10.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

We are now providing greater flexibility in deciding when serial numbers are required for parts in production. This update introduces configurable options at multiple levels, ensuring better traceability and compliance.

Challenge

Previously, serial number validation might unnecessarily block production when serial numbers were not needed for every part.

Solution

The updated logic introduces layered control across multiple applications.

  • Operation (OPR) application:

Enable Require serial number before completion to enforce serial number validation before completing a Work order operation (WOO).

  • Product (ART) application

Use Require serial number when traceable material to set default behavior for parts in the Product unit (LCM).

  • Product unit/Life cycle management (LCM) application

Override requirements for individual parts using the Req serialno checkbox in the Part List.

  • Production/Product structure level (KITARTOPRITM / KITDOCOPRITM)

Enable CheckSerialnoOnParts to enforce checks during production for specific operations.

For an overview of the layered control and procedures, click here.

Release date: 22 October 2025

RamBase release info - Week 40 - 2025

07.10.2025

RamBase release info - Week 39 - 2025

30.09.2025

Courses: Announcing the Autumn 2025 Course Calendar!

30.09.2025

Blog post added by Eli Havn

Classification:  USEFUL

 

We’re excited to share our Autumn 2025 course calendar! Whether you’re looking to deepen your knowledge of our ERP system or learn how to streamline your quality management system, we offer a range of courses and webinars tailored to your needs. Click the link below to explore what’s coming up:

 

Course calendar - Autumn 2025

RamBase release info - Week 38 - 2025

23.09.2025

RamBase release info - Week 37 - 2025

16.09.2025

RamBase release info - Week 36 - 2025

09.09.2025

RamBase release info - Week 35 - 2025

02.09.2025

Production: Improved Wastage Handling in Manufacturing

26.08.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

 

We’re enhancing how wastage is calculated in Production structures (KITDOC) to improve accuracy in material planning and cost estimation.

Background

In manufacturing, wastage typically occurs in two forms:

  • Startup Wastage: Fixed quantity lost at the beginning of each production run.

  • Running Wastage: Percentage-based loss relative to the produced quantity.

Previously, RamBase only applied the fixed wastage quantity when both types were specified, leading to inaccurate planning and tracking.

Problem

  • Percentage-based wastage was ignored, even when entered.

  • This caused incorrect inventory reservations, purchasing decisions, and cost estimations.

  • Additionally, incorrect wastage linking occurred after splitting a Production work order (PWO) without starting Work order operations (WOO).

Solution

The system now:

  • Includes both fixed and percentage-based wastage in total quantity calculations when both are specified in the Production structure (KITDOC).

  • Correctly handles wastage during Production work order (PWO) splits, even if no Work order operations (WOO) have started and all materials are picked.

Key Behavior

  • More accurate material consumption tracking.

  • Improved inventory planning and reduced risk of shortages or overstock.

  • Better cost estimation for production runs of varying sizes.

 

Release date: 28 August 2025

POSTPONED with new date! - Production: Improved Wastage Handling in Manufacturing

20.08.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

We sincerely apologize to our customers who have been waiting for this release.

To support a smooth transition and give everyone the necessary time to prepare, the release has been further postponed and is now scheduled for 28 August 2025.


We’re enhancing how wastage is calculated in Production structures (KITDOC) to improve accuracy in material planning and cost estimation.

Background

In manufacturing, wastage typically occurs in two forms:

  • Startup Wastage: Fixed quantity lost at the beginning of each production run.

  • Running Wastage: Percentage-based loss relative to the produced quantity.

Previously, RamBase only applied the fixed wastage quantity when both types were specified, leading to inaccurate planning and tracking.

Problem

  • Percentage-based wastage was ignored, even when entered.

  • This caused incorrect inventory reservations, purchasing decisions, and cost estimations.

  • Additionally, incorrect wastage linking occurred after splitting a Production work order (PWO) without starting Work order operations (WOO).

Solution

The system now:

  • Includes both fixed and percentage-based wastage in total quantity calculations when both are specified in the Production structure (KITDOC).

  • Correctly handles wastage during Production work order (PWO) splits, even if no Work order operations (WOO) have started and all materials are picked.

Key Behavior

  • More accurate material consumption tracking.

  • Improved inventory planning and reduced risk of shortages or overstock.

  • Better cost estimation for production runs of varying sizes.

New release date: 28 August 2025

RamBase release info - Week 33 - 2025

19.08.2025

POSTPONED! - Production: Improved Wastage Handling in Manufacturing

20.08.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

This release has been postponed by two days and is now scheduled for 28 August 2025, to allow time for final adjustments to be completed.


We’re enhancing how wastage is calculated in Production structures (KITDOC) to improve accuracy in material planning and cost estimation.

Background

In manufacturing, wastage typically occurs in two forms:

  • Startup Wastage: Fixed quantity lost at the beginning of each production run.

  • Running Wastage: Percentage-based loss relative to the produced quantity.

Previously, RamBase only applied the fixed wastage quantity when both types were specified, leading to inaccurate planning and tracking.

Problem

  • Percentage-based wastage was ignored, even when entered.

  • This caused incorrect inventory reservations, purchasing decisions, and cost estimations.

  • Additionally, incorrect wastage linking occurred after splitting a Production work order (PWO) without starting Work order operations (WOO).

Solution

The system now:

  • Includes both fixed and percentage-based wastage in total quantity calculations when both are specified in the Production structure (KITDOC).

  • Correctly handles wastage during Production work order (PWO) splits, even if no Work order operations (WOO) have started and all materials are picked.

Key Behavior

  • More accurate material consumption tracking.

  • Improved inventory planning and reduced risk of shortages or overstock.

  • Better cost estimation for production runs of varying sizes.

New release date: 28 August 2025

 

RamBase release info - Week 32 - 2025

12.08.2025

Production: Improved Wastage Handling in Manufacturing.

19.08.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

This release has been postponed by two days and is now scheduled for 21 August 2025, to allow time for final adjustments to be completed.


We’re enhancing how wastage is calculated in Production structures (KITDOC) to improve accuracy in material planning and cost estimation.

Background

In manufacturing, wastage typically occurs in two forms:

  • Startup Wastage: Fixed quantity lost at the beginning of each production run.

  • Running Wastage: Percentage-based loss relative to the produced quantity.

Previously, RamBase only applied the fixed wastage quantity when both types were specified, leading to inaccurate planning and tracking.

Problem

  • Percentage-based wastage was ignored, even when entered.

  • This caused incorrect inventory reservations, purchasing decisions, and cost estimations.

  • Additionally, incorrect wastage linking occurred after splitting a Production work order (PWO) without starting Work order operations (WOO).

Solution

The system now:

  • Includes both fixed and percentage-based wastage in total quantity calculations when both are specified in the Production structure (KITDOC).

  • Correctly handles wastage during Production work order (PWO) splits, even if no Work order operations (WOO) have started and all materials are picked.

Key Behavior

  • More accurate material consumption tracking.

  • Improved inventory planning and reduced risk of shortages or overstock.

  • Better cost estimation for production runs of varying sizes.

New release date: 21 August 2025

 

 

RamBase release info - Week 31 - 2025

05.08.2025

RamBase release info - Week 27 - 2025

08.07.2025

RamBase release info - Week 23 - 2025

10.06.2025

RamBase release info - Week 22 - 2025

03.06.2025

RamBase release info - Week 19 - 2025

13.05.2025

Webinar & Course reminder: Upcoming webinar for Subscription and upcoming Finance courses in May!

07.05.2025

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

Subscription webinar

Looking to launch or optimize your subscription model? Join our webinar to discover how RamBase Subscription Management simplifies personalized offers, seamless billing, and flexible contracts within RamBase Cloud ERP.

Daily Finance course

Welcome to our daily finance course, specifically designed for RamBase users who manage inbound and outbound invoices and payments. This course is ideal for individuals with limited experience in the RamBase finance module. It is also recommended for users who are responsible for period closure, as it covers essential topics for mastering this task. Upon completion, you will be well-prepared to advance to our Periodical Finance course.

Periodical Finance course
Are you ready to enhance your periodical finance skills in RamBase? This course is designed for RamBase users who work with period closure and has some experience in the Finance module or already completed the Daily Finance course. 

 

Check out the details via the links below and secure your spot today!

May 15: Subscription webinar 

May 20: ​Daily Finance course

May 21: ​Periodical Finance course

RamBase release info - Week 17 - 2025

29.04.2025

RamBase release info - Week 16 - 2025

22.04.2025

RamBase release info - Week 15 - 2025

15.04.2025

Production: Improved serial number validation in the Life cycle management (LCM) application

10.04.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

The goal of assigning serial numbers to individual Product units (LCM) is to make sure that its history is identifiable as it travels through the supply chain.

We are now making changes to how the validation logic functions when serial numbers are added through manual input via the Life cycle management (LCM) application.

 

Validation logic to be replaced

From the Life cycle management (LCM) application, users could previously enter any serial number into the SerialNo field in the Part list tab and in the Change LCM Part popup:

  • The entry was accepted if the entered serial number was available and existed in the Serial numbers (SNO) archive for Goods reception (SSA).

  • But if the serial number was already in use, then the manual input was rejected.

  • However, if the serial number was not found in the Serial numbers (SNO) archive, it was also accepted, regardless of whether the Goods reception (SSA) contained serial numbers, or not.

This logic could sometimes lead to traceability issues.

To simplify the rules and to improve upon the integrity of serial numbers we are therefore making the following changes:

New validation logic

Manual entries in the Life cycle management (LCM) application will now check the Goods reception (SSA) quantity against the Serial numbers (SNO) quantity.

  • If there is a quantity mismatch, no validation will be done except for serial numbers defined in the Goods reception (SSA) that are also used by any other Product unit (LCM).

    • An error message will inform the user, if the serial number is in use.

    • Any available serial number can be added via the previously mentioned fields in the Life cycle management (LCM) application.

  • If there is a quantity match, a validation will be run and all serial numbers must be available in the Serial numbers (SNO) archive.

    • If those criteria are met, the entry will be accepted.

Please note that an earlier version was previously released, but required to be rolled back due to unforeseen consequences.  

Release date: 14 April 2025

RamBase release info - Week 14 - 2025

08.04.2025

Production: Increased precision and flexibility in calculations for outsourced operations

03.04.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

In manufacturing, outsourced operations are Operations (OPR) in the Production structure (KITDOC), performed by a Production resource (RESCONFIG) of Type = External. The external production resource is a supplier that is performing a job on the product, and the job may be done at the suppliers site/factory.

Naturally, this implies that outsourced operations requires processes for purchase, outbound logistics and inbound logistics.

For outsourced operations, the Requested delivery date calculations were based on these factors:

  • The external Operation’s (OPR) Planned start date.

  • Which could then be subtracted with an optional margin specified in the Company setting (CSV), Delivery and request date margin days.

We are now planning on improving the accuracy of the Requested delivery date calculations for outsourced operations as the current solution can create inaccuracies.

 

Changes:

  • For Products (ART) of Type = WX, the Requested delivery date will now be based on the outsourced Operation’s (OPR) Planned finished at date.

  • The Planned finished at date can then be subtracted with an optional margin specified in a new Company setting (CSV), Margin days for outsource operation's required delivery date.  

 

The new calculations will impact several critical areas of RamBase and it is useful to know that if the Company setting (CSV), Margin days for outsource operation's required delivery date is set to '0' or 'OFF, only the Planned finished at date will be used in calculating the Requested delivery date.

 

Note that this only applies to outsourced operations and that the calculations for material needs, Products (ART) of TYPE = P, K, KA etc., will still use the current factors:

The Operation’s (OPR) Planned start date subtracted by the optional Company setting (CSV), Delivery and request date margin days.

 

Release date: 7 April 2025

RamBase release info - Week 13 - 2025

01.04.2025

Production: Improved serial number validation in the Life cycle management (LCM) application.

10.04.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

The goal of assigning serial numbers to individual Product units (LCM) is to make sure that its history is identifiable as it travels through the supply chain.

 

We are now making changes to how the validation logic functions when serial numbers are added through manual input via the Life cycle management (LCM) application.

 

Validation logic to be replaced

From the Life cycle management (LCM) application, users could previously enter any serial number into the SerialNo field in the Part list tab and in the Change LCM Part popup:

  • The entry was accepted if the entered serial number was available and existed in the Serial numbers (SNO) archive for Goods reception (SSA).

  • But if the serial number was already in use, then the manual input was rejected.

  • However, if the serial number was not found in the Serial numbers (SNO) archive, it was also accepted, regardless of whether the Goods reception (SSA) contained serial numbers, or not.

This logic could sometimes lead to traceability issues.

 

To simplify the rules and to improve upon the integrity of serial numbers we are therefore making the following changes:

 

New validation logic

Manual entries in the Life cycle management (LCM) application will now check the Goods reception (SSA) quantity against the Serial numbers (SNO) quantity.

  • If there is a quantity mismatch, no validation will be done except for serial numbers defined in the Goods reception (SSA) that are also used by any other Product unit (LCM).

    • An error message will inform the user, if the serial number is in use.

    • Any available serial number can be added via the previously mentioned fields in the Life cycle management (LCM) application.

  • If there is a quantity match, a validation will be run and all serial numbers must be available in the Serial numbers (SNO) archive.

    • If those criteria are met, the entry will be accepted.

Please note that an earlier version was previously released, but required to be rolled back due to unforeseen consequences.  

Release date: 14 April 2025

RamBase release info - Week 12 - 2025

25.03.2025

Production: Increased precision and flexibility in calculations for outsourced operations.

03.04.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

In manufacturing, outsourced operations are Operations (OPR) in the Production structure (KITDOC), performed by a Production resource (RESCONFIG) of Type = External. The external production resource is a supplier that is performing a job on the product, and the job may be done at the suppliers site/factory.

Naturally, this implies that outsourced operations requires processes for purchase, outbound logistics and inbound logistics.

For outsourced operations, the Requested delivery date calculations were based on these factors:

  • The external Operation’s (OPR) Planned start date.

  • Which could then be subtracted with an optional margin specified in the Company setting (CSV), Delivery and request date margin days.

We are now planning on improving the accuracy of the Requested delivery date calculations for outsourced operations as the current solution can create inaccuracies.

Changes:

  • For Products (ART) of Type = WX, the Requested delivery date will now be based on the outsourced Operation’s (OPR) Planned finished at date.

  • The Planned finished at date can then be subtracted with an optional margin specified in a new Company setting (CSV), Margin days for outsource operation's required delivery date.  

 

The new calculations will impact several critical areas of RamBase and it is useful to know that if the Company setting (CSV), Margin days for outsource operation's required delivery date is set to '0' or 'OFF, only the Planned finished at date will be used in calculating the Requested delivery date.

 

Note that this only applies to outsourced operations and that the calculations for material needs, Products (ART) of TYPE = P, K, KA etc., will still use the current factors:

The Operation’s (OPR) Planned start date subtracted by the optional Company setting (CSV), Delivery and request date margin days.

 

Release date: 7 April 2025

RamBase release info - Week 11 - 2025

18.03.2025

Admin: Significant improvements to the Load Article archive (ARTUPLOAD)

13.03.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

We have made significant improvements to the ARTUPLOAD functionality. The updated solution is now more user-friendly and comprehensible, particularly regarding error handling and field naming. Errors are no longer showstoppers—if one line fails validation, it is logged, and the import continues seamlessly with subsequent lines.

Additionally, older, less intuitive field names have been replaced with clear, standardized API names, making it easier to work with and understand the data.

With these changes, data imports are more reliable, errors are easier to diagnose, and the overall ARTUPLOAD process is significantly more user-friendly.

Summary of Changes

  1. Enhanced pre-validation

    • Additional checks are performed before data is passed to the standard update methods.

  2. Improved error handling

    • All errors (from both pre-validation and update methods) are captured and logged in the In/out log view (IOL) application.

    • If an error is found, the job continues with the next line in the file, rather than stopping altogether.

  3. Field Formatting

    • The system automatically handles decimal separators (comma vs. period) and certain date formats to reduce errors.

  4. Updated Field Names

    • All field names have been updated to more understandable API names, with clearer descriptions.

  5. New Fields:

    1. AutoCreateProductUnitAtGoodsReception

      1. This new field has been added to extend functionality.

      2. When activated, product units are automatically generated when goods are registered to stock.

    2. AutomaticallyCreateWorkOrdersForSubstructures

      1. This new field has been added to extend functionality.

      2. When activated, production work orders should be created for sub structures automatically.

  6. Field Blanking

    • Fields can be blanked out by sending in the value <BLANK>.

    • This applies to:

      • CustomField1, CustomField2, CustomField3, InternalNote, CountryOfOriginCode, DomesticCustomsTariffCode, EUCustomsTariffCode and PurchaseGroupName

Please note that this update will replace the current Load Article archive (ARTUPLOAD) on release. We also recommend using the standard rules for field formatting for all other load jobs.  

Click the links to read more about the Load Article archive (ARTUPLOAD) - INP/14542, as well as the Load procedure - Input menu (INP) and Import/export Wizard (IOQWIZ).

 

Release date: 17 March 2025

Courses: Announcing the Spring 2025 Course Calendar!

11.03.2025

Blog post edited by Eli Havn

Classification:  USEFUL

 

We’re excited to share our course calendar for Spring 2025! Whether you want to deepen your knowledge of our ERP system or develop specific skills, we offer a variety of courses and webinars tailored to your needs. Click the link below to explore our upcoming courses and webinars.

 

Course calendar - Spring 2025

RamBase release info - Week 9 - 2025

04.03.2025

Admin: Significant improvements to the Load Article archive (ARTUPLOAD).

13.03.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

We have made significant improvements to the ARTUPLOAD functionality. The updated solution is now more user-friendly and comprehensible, particularly regarding error handling and field naming. Errors are no longer showstoppers—if one line fails validation, it is logged, and the import continues seamlessly with subsequent lines.

Additionally, older, less intuitive field names have been replaced with clear, standardized API names, making it easier to work with and understand the data.

With these changes, data imports are more reliable, errors are easier to diagnose, and the overall ARTUPLOAD process is significantly more user-friendly.

Summary of Changes

  1. Enhanced pre-validation

    • Additional checks are performed before data is passed to the standard update methods.

  2. Improved error handling

    • All errors (from both pre-validation and update methods) are captured and logged in the In/out log view (IOL) application.

    • If an error is found, the job continues with the next line in the file, rather than stopping altogether.

  3. Field Formatting

    • The system automatically handles decimal separators (comma vs. period) and certain date formats to reduce errors.

  4. Updated Field Names

    • All field names have been updated to more understandable API names, with clearer descriptions.

  5. New Fields:

    1. AutoCreateProductUnitAtGoodsReception

      1. This new field has been added to extend functionality.

      2. When activated, product units are automatically generated when goods are registered to stock.

    2. AutomaticallyCreateWorkOrdersForSubstructures

      1. This new field has been added to extend functionality.

      2. When activated, production work orders should be created for sub structures automatically.

  6. Field Blanking

    • Fields can be blanked out by sending in the value <BLANK>.

    • This applies to:

      • CustomField1, CustomField2, CustomField3, InternalNote, CountryOfOriginCode, DomesticCustomsTariffCode, EUCustomsTariffCode and PurchaseGroupName


Please note that this update will replace the current Load Article archive (ARTUPLOAD) on release. We also recommend using the standard rules for field formatting for all other load jobs.  

Click the links to read more about the Load Article archive (ARTUPLOAD) - INP/14542, as well as the Load procedure - Input menu (INP) and Import/export Wizard (IOQWIZ).

Release date: 17 March 2025

RamBase release info - Week 8 - 2025

25.02.2025

RamBase release info - Week 7 - 2025

18.02.2025

Rental: Release of the new Subscription sub-module

17.02.2025

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

 

Whether you're launching your first subscription or looking to optimize your existing model—our solution is designed to easily help you create and manage a smooth subscription experience with your customers.

The RamBase Subscription is a sub-module under Rental. It is tailored towards the B2B market for
subscription of non-physical products such as services or licenses. The sub-module is a fully integrated subscription management and billing system that supports recurring
revenue models.

Users may be familiar with the current subscription features within the system. However, this launch introduces an entirely new solution developed from the ground up, in close partnership with customers.

The new solution is based on the Rental overview (RCS) application as the starting point for all rental and subscription handling in RamBase. The application introduces efficient breadcrumb navigation with focus on overview and natural work flow. Allowing the user to view all Rental contracts (RCT), which envelopes subscription, while at the same time being able to drill down to the lowest levels of a Rental contract item (RCTITEM).

The work flow is further reinforced by the fact that the contract, independently of status, will keep its identifier.

Basis for revenue is defined in the Recurring rates (RRT) application which is used to define rates for Products (ART) with the additional option of creating highly tailored rate steps.

Key capabilities include:

  • Dynamic contract management: Real-time customization of plans, add-ons, and discounts, enabling quick adjustments to rates based on client negotiations, or promotions.

  • Centralized subscription handling: Unified user-centric subscription handling enables you to create, manage and scale offerings in one place.

  • Flexible billing options: Incentivize your customers to join with special offers, discounts, custom pricing, and custom billing cycles.

  • Revenue assurance: Ensure that your invoices are accurately billed based on the contractual agreements you have with your customers.

Want to explore Subscription Management further? Visit the Subscription Management feature page on RamBase.com and our documentation to learn more about key features and benefits.

For any inquiries or additional clarification needed, feel free to contact our support team.

Please note that this functionality is planned to replace our current subscription functionality.

 

Release date: 17 February 2025

RamBase release info - Week 6 - 2025

11.02.2025

RamBase release info - Week 4 - 2025

28.01.2025

RamBase release info - Week 3 - 2025

21.01.2025

Finance: Change in payment reconciliation process.

20.01.2025

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We would like to inform you that the PAY reconciliation (RECPAY) application will no longer support payment reconciliation for the year 2025 and beyond. Starting in 2025, all payment reconciliation tasks should be performed using the Bank statement (BST) application. 

 

As part of this transition, we will release functionality for manually creating Bank statements (BST), with the resulting impact on PAY reconciliation (RECPAY) processes. Once the manual Bank statement (BST) functionality is implemented, PAY reconciliation (RECPAY) will be fully retired. However user will be still able to access RECPAY to see history and make reconciliation for 2024. This change aims to streamline our processes and ensure a more efficient reconciliation experience.

 

Please update your workflows accordingly and reach out to our support team if you have any questions or need assistance.

 

Users will be provided with a link to detailed instructions on how to manually create Bank statements (BST) in the second release notification.

To read more about the Manual bank reconciliation (BST), click here.

 

Release date: 22 January 2025

RamBase release info - Week 2 - 2025

14.01.2025

Logistics: Enhanced supply chain visibility and collaboration with the re-designed Arriving waybills (WBI) application.

13.01.2025

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

The Arriving waybill (WBI) application contains critical information about shipment contents, senders and recipients details, addresses, the point of origin, intended routes and estimated times of departure and arrivals.

We are now further enhancing the application in several areas to increase traceability and visibility into the goods in transit. 

To accommodate these enhancements, a re-design of the Arriving waybill (WBI) application has been done along with related changes in the Receive goods (RPP) and Purchase order response (SOA) applications.

Listed below are the key benefits in this update:

  • The Arriving waybill (WBI) application has been re-designed allowing for a smoother workflow as critical details are always visible while details are logically categorized into the new tabs: Expected goods, Received goods and Shipments and customs details.

  • Purchaser order response items (SOAITEM) can be added to an Arriving waybill (WBI) as an expectation of what’s in transit from the supplier.

    • The Arriving waybill identifier (WBI) will be linked and referenced in the Purchase order response item (SOAITEM) application, in the new field Expected arriving waybill.

  • New date fields are available in the Arriving waybills (WBI) application allowing the addition of information about Expected time of delivery, Actual time of delivery, Expected time of delivery and Actual time of arrival.

    • This information will also be referenced and available as columns in the Purchase order response item (SOAITEM) application.

  • When in the process of creating Goods receptions (SSA), it will be possible to multi-select Purchase order items (SPOITEM) and Purchase order response items (SOAITEM) in the Receive goods (RPP) application, even if the document identifier is not the same.

  • Multi-select will be supported when registering Goods receptions (SSA) received in a specific Arriving waybill (WBI).

  • Navigating directly to the carrier's tracking web site can now be done from the Arriving waybill (WBI) application.

To read up on the coming changes for Arriving waybills (WBI), click here.

 

Release date: 15 January 2025

Admin: Transition to the new Notification Center in RamBase.

09.01.2025

Blog post added by Alberina Shala

Classification: IMPORTANT

 

The new Notification center in RamBase is now live.


We are excited to announce the new Notification center in RamBase. You will now be able to receive notifications directly from the RamBase system or other users, providing you with a more streamlined notification experience, with the option to filter and customize how your notifications are displayed.

 

Please note that the Internal message service (IMS) application will be phased out and removed by May 1. If you wish to view old messages, you can still manually start the Internal message service (IMS) application for the time being.

 

We encourage all users to familiarize themselves with the new Notification center.

 

To read more about the Notification center, click here

 

Release date: Already released

Finance: Change in payment reconciliation process

08.01.2025

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We would like to inform you that the PAY reconciliation (RECPAY) application will no longer support payment reconciliation for the year 2025 and beyond. Starting in 2025, all payment reconciliation tasks should be performed using the Bank statement (BST) application. 

 

As part of this transition, we will release functionality for manually creating Bank statements (BST), with the resulting impact on PAY reconciliation (RECPAY) processes. Once the manual Bank statement (BST) functionality is implemented, PAY reconciliation (RECPAY) will be fully retired. However user will be still able to access RECPAY to see history and make reconciliation for 2024. This change aims to streamline our processes and ensure a more efficient reconciliation experience.

 

Please update your workflows accordingly and reach out to our support team if you have any questions or need assistance.

 

Users will be provided with a link to detailed instructions on how to manually create Bank statements (BST) in the second release notification.

 

Release date: 22 January 2025

RamBase release info - Week 51 - 2024

24.12.2024

RamBase release info - Week 50 - 2024

17.12.2024

Logistics: Enhanced supply chain visibility and collaboration with the re-designed Arriving waybills (WBI) application

16.12.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

The Arriving waybill (WBI) application contains critical information about shipment contents, senders and recipients details, addresses, the point of origin, intended routes and estimated times of departure and arrivals.

We are now further enhancing the application in several areas to increase traceability and visibility into the goods in transit. 

To accommodate these enhancements, a re-design of the Arriving waybill (WBI) application has been done along with related changes in the Receive goods (RPP) and Purchase order response (SOA) applications.

Listed below are the key benefits in this update:

  • The Arriving waybill (WBI) application has been re-designed allowing for a smoother workflow as critical details are always visible while details are logically categorized into the new tabs: Expected goods, Received goods and Shipments and customs details.

  • Purchaser order response items (SOAITEM) can be added to an Arriving waybill (WBI) as an expectation of what’s in transit from the supplier.

    • The Arriving waybill identifier (WBI) will be linked and referenced in the Purchase order response item (SOAITEM) application, in the new field Expected arriving waybill.

  • New date fields are available in the Arriving waybills (WBI) application allowing the addition of information about Expected time of delivery, Actual time of delivery, Expected time of delivery and Actual time of arrival.

    • This information will also be referenced and available as columns in the Purchase order response item (SOAITEM) application.

  • When in the process of creating Goods receptions (SSA), it will be possible to multi-select Purchase order items (SPOITEM) and Purchase order response items (SOAITEM) in the Receive goods (RPP) application, even if the document identifier is not the same.

  • Multi-select will be supported when registering Goods receptions (SSA) received in a specific Arriving waybill (WBI).

  • Navigating directly to the carrier's tracking web site can now be done from the Arriving waybill (WBI) application.

 

Release: Early January - Users will be notified two working days in advance of the release.

Admin: Transition to the new Notification center in RamBase

16.12.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We are excited to announce the new Notification centerin RamBase. You will soon be able to receive notifications directly from the RamBase system or other users, providing you with a more streamlined notification experience, with the option to filter and customize how your notifications are displayed.

 

Please note that the Internal message service (IMS) application will be phased out and removed by the end of the year. If you wish to view old messages, you can still manually start the Internal message service (IMS) app for the time being.

 

We encourage all users to familiarize themselves with the new Notification center after release.

To read more about the Notification center, click here

 

Release date: 18 December 2024

Finance: Updated release schedule for the multiple releases to accommodate compliance and regulations in 2025

12.12.2024

Blog post edited by Knut Sætre Waka (Deactivated)

Classification: USEFUL

Enhancements coming sooner than planned!

 

We are excited to inform you that the features initially scheduled for release on 23 December 2024 will be released by the end of next week. This adjustment ensures you have more time to explore and benefit from the new releases. 

 

We understand that changes in schedules can raise questions, but please note that this release has been changed from Important to Useful as it will not impact your day to day operations. Our support team is ready to assist with any concerns or preparations needed for this earlier release.

Link to initial release message.

RamBase release info - Week 49 - 2024

10.12.2024

RamBase Customer Satisfaction Survey 2024

10.12.2024

Blog post added by Joakim Bringedal

Classification: USEFUL

We are constantly looking for ways to improve, and to be able to do this, we need your help. Please lend us a couple of minutes and complete the customer satisfaction survey, shared by email, from info@rambase.net, on Thursday/Friday week 49. Please contact support@rambase.net if you have any questions.

Deadline: 18 December 2024

Finance: (For Norwegian and Polish companies) Multiple releases to accommodate compliance and regulations in 2025

10.12.2024

Blog post edited by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 


Adjustments made in RamBase to accommodate the new version of SAF-T Financial (Norway)

Classification: IMPORTANT

 

We have made the necessary adjustments in RamBase to accommodate the new version of SAF-T Financial. The new form (version 1.30) is required from 1 January 2025. You can read more about SAF-T Financial here.

 

The user will experience the following improvements and changes:

Changes to the SAF-T file:

  • The element TaxAmount is replaced with two new elements, DebitTaxAmount and CreditTaxAmount.

  • GroupingCategory and GroupingCode has replaced the SaftStandard account.

  • ModficationDate is added.

To support the new grouping fields, we have implemented the country requirements concept.

  • New tab, Country requirements, in the Chart of accounts (ACC) application to show the country requirements – This will show the two new grouping fields.

  • New option in the context menu, Assign SAF-T grouping, in the Chart of accounts (ACC) application – This will automatically fill out the grouping fields.

  • New report, Chart of account compared to SAFT grouping category and code, available from the Chart of account (ACC) application – This will show the overview of status of mapping and is available in the Chart of account (ACC) application with the new View report for SAF-T grouping code validation option in the context menu.

 

Release date: 23 December 2024


VAT Whitelist check integrated with Polish localization

Classification:  IMPORTANT

 

The Polish Whitelist of VAT Taxpayers is an online list of VAT payers, which contains important information about entities conducting business activity in Poland. Therefore, it enables taxpayers to quickly and comprehensively verify the registry data of counter-parties.

 

In 2021, we took a first step in launching the Whitelist (PLWHITELIST) application as an extension in the Marketplace allowing our users to be in compliance with Polish VAT requirements.

 

Now, we are making a leap by integrating automatic VAT Whitelist checks with all relevant functionality:

  • New column added to the Pay management (PAM) application, detailing Whitelist validation.

  • New checkbox, banners, columns and icon added to the Supplier (SUP) application:  

    • An icon to trigger a validation with the results being displayed in the columns mentioned below.

    • The Last positive whitelist check and Exists on whitelist columns have been added in the list of Bank accounts found in the Settings tab, and then by clicking the Finance sub-tab.

    • The banners; Whitelist validation successful, Whitelist validation failed and Whitelist is not published are added to the header based on the result of the validation.

    • The checkbox, Allow to continue payment even bank account is not validated through whitelist is also added to provide the option of making a payment to a supplier's bank account that has not been properly validated in the VAT taxpayer whitelist.

  • A new Company setting (CSV) named “The amount above which payments are verified on the Polish white list in the remittance process”.

    • The setting performs checks on all payments to Polish companies for payments greater than the set amount in the company's currency.

The use of RamBase Whitelist is included in the Polish localization and ensures that you do not have to spend time switching between your system and the taxpayers list.   

 

Release date: 23 December 2024


New JPK_KR_PD file available in RamBase (Poland)

Classification: IMPORTANT

The JPK-KR_PD file provides detailed records of the company’s accounting books.

The JPK-KR_PD file can be ordered from the General ledger (ATR) application. Click on the Order JPK_KR_PD file for general ledger… option in the context menu.

Since the authority can request the file up to five years back in time, the old JPK_KR file will still be available for ordering in the General ledger (ATR) application.

Release date: 23 December 2024


 

RamBase release info - Week 48 - 2024

03.12.2024

Customer Event: RamBase Summit 2025 – Sign up now

03.12.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

 

We invite all RamBase users to our annual customer event on the 8th and 9th of April 2025. The event is hosted at Sola Strand Hotel, just outside Stavanger, Norway.

 

Early bird offer is available until 31.12.2024  Book your seat and read more about the event here: https://www.rambase.com/rambase-summit-2025

 

The theme for this year's customer event is "Release your potential”!

After two days together, we hope you leave with more than just ideas for using our systems effectively. We want to inspire new ways of thinking about your daily work, introduce simple strategies you can manage easily, and share new connections and experiences with you.

 

What to look forward to:

  • Inspirational speakers and business discussions

  • Parallel sessions with tailored tracks for your business interests

  • Industry insights directly from our customers

  • Discover integrations for maximizing value with our systems

  • And of course, having a great time together!

 

Finance: Separate accumulated depreciation account for fixed asset reporting

28.11.2024

Blog post added by Joakim Bringedal

Classification: USEFUL

To provide a more flexible setup that meets different reporting needs, RamBase now supports gross reporting for fixed assets. This feature enables transparent reporting of acquisition cost and accumulated depreciation as separate entries on the balance sheet.

This enhancement introduces an additional field in the fixed asset configuration in the Depreciation rules (DPR) application for the Accumulated Depreciation Account, ensuring a clear separation of acquisition value and accumulated depreciation in financial reports.

By implementing this setup, RamBase aligns with both local and international accounting standards, reducing compliance risks, and providing clearer and more transparent reporting for auditors and stakeholders.

This functionality will only be available for new Depreciation rules (DPR). For existing setups, no changes are necessary, as depreciation will continue to be recorded on the main balance account as before.

 

Release date: 9 December 2024

RamBase release info - Week 47 - 2024

26.11.2024

RamBase release info - Week 46 - 2024

19.11.2024

RamBase release info - Week 45 - 2024

12.11.2024

RamBase release info - Week 44 - 2024

05.11.2024

POSTPONED! Admin: Transition to new Notification center in RamBase

30.10.2024

Blog post added by Joakim Bringedal

Classification: IMPORTANT

 

The release of the new Notification center in RamBase has been postponed. We will inform you when the new release date is set.

________________________________________________________________________________________________________________

We are excited to announce the new Notification center in RamBase. You will soon be able to receive notifications directly from the RamBase system or other users, providing you with a more streamlined notification experience, with the option to filter and customize how your notifications are displayed.

 

Please note that the Internal message service (IMS) application will be phased out and removed by the end of the year. If you wish to view old messages, you can still manually start the Internal message service (IMS) app for the time being.

 

We encourage all users to familiarize themselves with the new Notification center after release.

To read more about the Notification center, click here

 

Release date: TBD

RamBase release info - Week 43 - 2024

29.10.2024

Production: Retirement of the Production calendar (PRODCALENDAR) application.

28.10.2024

Blog post edited by Alberina Shala

Classification: IMPORTANT

 

Following the recent release of the Working time templates (WTT) and Unavailable period templates (UPT) applications, we would like to inform everyone that the Production calendar (PRODCALENDAR) application will be phased out and removed by October 30th.

All data currently available in the Production calendar (PRODCALENDER) application will be seamlessly transferred to Working time templates (WTT) and Unavailable period templates (UPT) applications.

 

We encourage all users to familiarize themselves with the new Working time templates (WTT) and Unavailable period templates (UPT) applications before this date to ensure a smooth transition.

 

To read up on the new Working time templates (WTT) application, click here

To read up on the new Unavailable period templates (UPT) application, click here

 

Retirement date: 30 October 2024

Admin: Transition to new Notification center in RamBase.

25.10.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We are excited to announce the new Notification centerin RamBase. You will soon be able to receive notifications directly from the RamBase system or other users, providing you with a more streamlined notification experience, with the option to filter and customize how your notifications are displayed.

Please note that the Internal message service (IMS) application will be phased out and removed by the end of the year. If you wish to view old messages, you can still manually start the Internal message service (IMS) app for the time being.

 

We encourage all users to familiarize themselves with the new Notification center after release.

 

To read more about the Notification center, click here

 

Release date: 29 October 2024

RamBase release info - Week 42 - 2024

22.10.2024

Production: Retirement of the Production calendar (PRODCALENDAR) application

16.10.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

Following the recent release of the Working time templates (WTT) and Unavailable period templates (UPT) applications, we would like to inform everyone that the Production calendar (PRODCALENDAR) application will be phased out and removed by October 30th.

 

We encourage all users to familiarize themselves with the new Working time templates (WTT) and Unavailable period templates (UPT) applications before this date to ensure a smooth transition.

 

To read up on the new Working time templates (WTT) application, click here

To read up on the new Unavailable period templates (UPT) application, click here

 

Retirement date: 30 October 2024

Admin: Transition to new Notification center in RamBase

15.10.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We are excited to announce the new Notification centerin RamBase. You will soon be able to receive notifications directly from the RamBase system or other users, providing you with a more streamlined notification experience, with the option to filter and customize how your notifications are displayed.


Please note that the Internal message service (IMS) application will be phased out and removed by the end of the year. If you wish to view old messages, you can still manually start the Internal message service (IMS) app for the time being.

 

We encourage all users to familiarize themselves with the new Notification center after release.

To read more about the Notification center, click here

 

Release date: 29 October 2024

RamBase release info - Week 41 - 2024

15.10.2024

Logistics: Changes in the Pick (PICK) application to enhance user experience and efficiency.

10.10.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

As one of the first applications to be developed for our current framework, the Pick (PICK) application is due for a makeover in line with the lessons we have learned together.

Previously, the Pick (PICK) application often required multiple clicks and corrections due to the layout and design of the application. This has now been taken into consideration.

 

The user will experience the following improvements and changes:

  • Suggested values for Picked Qty.

  • User is warned when Picked Qty is below the minimum or above the maximum quantity to pick.

  • Improved layout of buttons to increase efficiency and reduce number of clicks.

  • Improved color variation to highlight Pick Status.

Please note that the Pick (PICK) application is a desktop alternative to picking by hand held device and can be used in picking for; production, supplier returns, service orders, rental orders, project orders and transfer of goods.

 

To read more about the Pick (PICK) application and how to confirm the picking of goods, click here.

 

Release date: 14 October 2024

RamBase release info - Week 40 - 2024

08.10.2024

Logistics: Retirement of the Prepare for picking (PREPICK) application.

04.10.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 
Following the recent release of the enhanced Fulfilment planning (PFP) application, we would like to remind everyone that the old Prepare for picking (PREPICK) application is now fully integrated into the Fulfilment planning (PFP) application, under the Picking queue tab.

As a result of this upgrade, the old Prepare for picking (PREPICK) application will be deleted on October 8th. We encourage all users to familiarize themselves with the new Picking queue tab before this date to ensure a smooth transition.

 

Release date: 8 October 2024

RamBase release info - Week 39 - 2024

01.10.2024

Logistics: Changes in the Pick (PICK) application to enhance user experience and efficiency

30.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification: IMPORTANT

 

As one of the first applications to be developed for our current framework, the Pick (PICK) application is due for a makeover in line with the lessons we have learned together.

Previously, the Pick (PICK) application often required multiple clicks and corrections due to the layout and design of the application. This has now been taken into consideration.

The user will experience the following improvements and changes:

  • Suggested values for Picked Qty.

  • User is warned when Picked Qty is below the minimum or above the maximum quantity to pick.

  • Improved layout of buttons to increase efficiency and reduce number of clicks.

  • Improved color variation to highlight Pick Status.

Please note that the Pick (PICK) application is a desktop alternative to picking by hand held device and can be used in picking for; production, supplier returns, service orders, rental orders, project orders and transfer of goods.

To read more about the Pick (PICK) application and how to confirm the picking of goods, click here.

 

Release date: 14 October 2024

RamBase release info - Week 38 - 2024

24.09.2024

Logistics: Retirement of the Prepare for picking (PREPICK) application

24.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification: IMPORTANT

 

Following the recent release of the enhanced Fulfilment planning (PFP) application, we would like to remind everyone that the old Prepare for picking (PREPICK) application is now fully integrated into the Fulfilment planning (PFP) application, under the Picking queue tab.

As a result of this upgrade, the old Prepare for picking (PREPICK) application will be deleted on October 8th. We encourage all users to familiarize themselves with the new Picking queue tab before this date to ensure a smooth transition.

 

Release date: 8 October 2024

Production: Production calendar (PRODCALENDAR) is being replaced by the new Working time templates (WTT) and Unavailable period templates (UPT) applications.

23.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

With the new Working time templates (WTT) application, users can create templates for Working timesUnavailable periods and Resources. Allowing increased efficiency and overview when defining the capacity that is available for your production needs in meeting customer expectations. 

 

Additionally we have made the Unavailable period templates (UPT) application, which is used to create new templates for specific days when production resources are unavailable, for example state holidays. 

 

The two new applications are designed to work in unison by merging the Working time template (WTT) with the Unavailable period template (UPT). And the goal is to be able to set up calendars that can be reused on many resources, so that you don't have to do the same work on each resource.

 

Users may switch between the Working time templates (WTT) and Unavailable period templates (UPT) applications quickly by clicking on the button with application name at the top of either applications.

Read more about the Working time templates (WTT) application

Read more about the Unavailable period templates (UPT) application

Release date:  25 September 2024

Production: Notification on remove, improve and replace of critical production applications.

23.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

Earlier this year, we released a set of applications with the intent to improve upon and in time, replace existing functionality.

Time has now come and we are happy to announce the following improvements:

 

Production work order tree view (PWOTREEVIEW) is being replaced with new Inspect subproductions (PWOTREE) application

 

The Inspect subproductions (PWOTREE) application is specifically designed for Production work orders (PWO) to display all associated subproductions in a comprehensive tree view. Initially, this feature was available within the the Order overview (OOV) and Schedule production jobs (SPJ) applications.

With this latest update, we’ve extended the Inspect subproductions (PWOTREE) functionality to both the Production work order (PWO) and Sales order item (COAITEM) applications.

This enhancement allows you to not only view detailed information on each subproduction but also provides insights into related Sales orders (COA) and Goods reception items (SSAITEM), if forwarded from a completed Production work order (PWO).

You can easily access the enhanced overview directly from the Context menu in both the Production work order (PWO) and Sales order item (COAITEM) applications by selecting the Production tree view option.

 

For more detailed information on the Inspect subproductions (PWOTREE) application, click here.

 

Production backlog customer (PBCOA) is being replaced with the previously released Order overview (OOV) application

 

The Orders overview (OOV) application lists all open Sales order items (COAITEM) with a Production work order (PWO), and with the click of a button, access the Sales order (COA) application to view and edit details.

 

The extensive filtering options allow all open Sales order items (COAITEM) to be arranged according to the users' needs.

Additionally the user can quickly inspect assignments, production planning and more.   

 

For more detailed information on the Orders overview (OOV) application, click here.

 

Production work orders (PWO) is being replaced with the previously released Production work orders menu (PWOMENU)

 

The Production work orders menu (PWOMENU) lists all Production work orders (PWO) in an easy to use interface.

 

The new application includes a lot of the functionality from the now replaced Production work orders (PWO) application, but with the added functionality of the Productions tab from the Production planning (PRODPLAN) application, along with other additional improvements.

 

For more detailed information on the Production work orders menu (PWOMENU) application, click here.

 

 

Planned release date: 25 September 2024

RamBase release info - Week 37 - 2024

17.09.2024

Production: Production calendar (PRODCALENDAR) is being replaced by the new Working time templates (WTT) and Unavailable period templates (UPT) applications

11.09.2024

Blog post added by Alberina Shala

Classification:  IMPORTANT

 

With the new Working time templates (WTT) application, users can create templates for Working times, Unavailable periods and Resources. Allowing increased efficiency and overview when defining the capacity that is available for your production needs in meeting customer expectations. 

 

Additionally we have made the Unavailable period templates (UPT) application, which is used to create new templates for specific days when production resources are unavailable, for example state holidays. 

 

The two new applications are designed to work in unison by merging the Working time template (WTT) with the Unavailable period template (UPT). And the goal is to be able to set up calendars that can be reused on many resources, so that you don't have to do the same work on each resource.

 

Users may switch between the Working time templates (WTT) and Unavailable period templates (UPT) applications quickly by clicking on the button with application name at the top of either applications.

Read more about the Working time templates (WTT) application

Read more about the Unavailable period templates (UPT) application


Release date: 25 September 2024

Production: Notification on remove, improve and replace of critical production applications

11.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification: IMPORTANT

 

Earlier this year, we released a set of applications with the intent to improve up on and in time, replace existing functionality.

Time has now come and we are happy to announce the following improvements:

 

Production work order tree view (PWOTREEVIEW) is being replaced with new Inspect subproductions (PWOTREE) application

 

The Inspect subproductions (PWOTREE) application is specifically designed for Production work orders (PWO) to display all associated subproductions in a comprehensive tree view. Initially, this feature was available within the the Order overview (OOV) and Schedule production jobs (SPJ) applications.

With this latest update, we’ve extended the Inspect subproductions (PWOTREE) functionality to both the Production work order (PWO) and Sales order item (COAITEM) applications.

This enhancement allows you to not only view detailed information on each subproduction but also provides insights into related Sales orders (COA) and Goods reception items (SSAITEM), if forwarded from a completed Production work order.

You can easily access the enhanced overview directly from the Context menu in both the Production work order (PWO) and Sales order item (COAITEM) applications by selecting the Production tree view option.

 

For more detailed information on the Inspect subproductions (PWOTREE) application, click here.

 

Production backlog customer (PBCOA) is being replaced with the previously released Order overview (OOV) application

 

The Orders overview (OOV) application lists all open Sales order items (COAITEM) with a Production work order (PWO), and with the click of a button, access the Sales order (COA) application to view and edit details.

 

The extensive filtering options allow all open Sales order items (COAITEM) to be arranged according to the users' needs.

Additionally the user can quickly inspect assignments, production planning and more.   

 

For more detailed information on the Orders overview (OOV) application, click here.

 

Production work orders (PWO) is being replaced with the previously released Production work orders menu (PWOMENU)

 

The Production work orders menu (PWOMENU) lists all Production work orders (PWO) in an easy to use interface.

 

The new application includes a lot of the functionality from the now replaced Production work orders (PWO) application, but with the added functionality of the Productions tab from the Production planning (PRODPLAN) application, along with other additional improvements.

 

For more detailed information on the Production work orders menu (PWOMENU) application, click here.

 

 

Planned release date: 25 September 2024

 

RamBase release info - Week 36 - 2024

10.09.2024

Production: Update to export file from RamBase to Rob_Ex planner

06.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

We have made an enhancement to the XML-file export from RamBase to Rob_Ex by providing additional material status information.

The matCal field in the operation <Opr> tag gives the last expected availability date for the material/parts required for an operation. It is based on the last confirmed date or if one or more links are unconfirmed, and in that case the date will be based on purchase lead time.

We have now added a material status indication in the cusText1 field in the operation <Opr> tag. This field will now display the current status of material for each operation.

  1. PENDING - If one or more material lines for the operation is not purchase (linked to ‘pending’):

    • New field ‘cusText1’=PENDING.

  2. UNCONFIRMED - If no ‘pending’ link, but one or more material lines for the operation linked to not confirmed purchase order or not confirmed production work order:

    • New field ‘cusText1’=UNCONFIRMED.

  3. CONFIRMED - If no material lines for the operation get match from 1 (PENDING) or 2 (UNCONFIRMED), all is confirmed or linked to stock:

    • New field ‘cusText1’=Confirmed.

 

Planned release date: 10 September 2024

Logistics: Introducing the improved Fulfillment planning (PFP) application.

06.09.2024

Blog post edited by Alberina Shala

Classification: IMPORTANT

 

We are excited to announce the upcoming release of the improved Fulfillment planning (PFP) application designed to enhance user experience and efficiency.

Key Features:

  • Prepare for picking (PREPICK): The Prepare for picking (PREPICK) application has been integrated into the Fulfillment planning (PFP) application as a dedicated tab called Picking queue, removing the need for a separate application.

  • Flexible picking list: Users can now generate picking lists for individual documents, all documents, or selected documents. There is also an option to assign a person to the task, though this is entirely optional.

    • If multiple documents are selected, users can choose between creating a single picking list for all documents or generating separate lists for each. This can be further customized using the Group by order or Group by common options.

  • Multi-Selection & Filtering: Users can multi-select documents or apply various filters to refine their selection. Once filtered, a picking list can be created based on the narrowed results.


Enhancements and Changes:

  • The tab previously labeled as Add to picking queue has been renamed to Prepare for picking.

  • New fields have been introduced in the Send filtered items to picking process popup, offering more options.

  • Picks and Priority columns have been added to the column settings in the Picking list (PIL) application.

  • Multiselect is now available in the Picking list (PIL) application, along with the ability to update the assignee.

While the look and feel of the application might have changed, the core functionality and logic still remains the same.

NB! The old Prepare for picking (PREPICK) application will be discontinued four weeks after the release of this new feature in the Fulfillment planning (PFP) application.


Read more about the Fulfillment planning (PFP) application 

Release date: 10 September 2024

RamBase QMS HotFix 3.21.2

03.09.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

 

We wanted to inform you that HotFix 3.21.2 has been or will be deployed on your site in the near future.

We recognize that you have been experiencing some challenges, and this update is designed to enhance your daily experience with the system. While this fix addresses several issues, we are aware that it may not resolve everything.

Please rest assured that we are actively working on additional improvements and will be releasing further updates in the near future.

We apologize for any inconvenience this may cause and appreciate your patience as we work to enhance the system. We will continue to keep you informed of our progress.

 

Thank you for your understanding and continued support. 

To read the full list of fixes, click here.

 

Courses: Remember the Course Calendar for Fall 2024!

02.09.2024

Blog post edited by Alberina Shala

Classification:  USEFUL

Remember our course calendar for the fall! Whether you want to deepen your knowledge of our ERP system or enhance specific skills, we offer a variety of courses designed to meet your needs. Click the link below to explore our upcoming courses.

Course calendar - Fall 2024

Logistics: Introducing the improved Fulfilment planning (PFP) application

27.08.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

 

We are excited to announce the upcoming release of the improved Fulfilment planning (PFP) application designed to enhance user experience and efficiency.

Key Features:

  • Prepare for picking (PREPICK): The Prepare for picking (PREPICK) application has been integrated into the Fulfilment planning (PFP) application as a dedicated tab called Picking queue, removing the need for a separate application.

  • Flexible picking list: Users can now generate picking lists for individual documents, all documents, or selected documents. There is also an option to assign a person to the task, though this is entirely optional.

    • If multiple documents are selected, users can choose between creating a single picking list for all documents or generating separate lists for each. This can be further customized using the Group by order or Group by common options.

  • Multi-Selection & Filtering: Users can multi-select documents or apply various filters to refine their selection. Once filtered, a picking list can be created based on the narrowed results.


Enhancements and Changes:

  • The tab previously labeled as Add to picking queue has been renamed to Prepare for picking.

  • New fields have been introduced in the Send filtered items to picking process popup, offering more options.

  • Picks and Priority columns have been added to the column settings in the Picking list (PIL) application.

  • Multiselect is now available in the Picking list (PIL) application, along with the ability to update the assignee.

While the look and feel of the application might have changed, the core functionality and logic still remains the same.

NB! The old Prepare for picking (PREPICK) application will be discontinued four weeks after the release of this new feature in the Fulfilment planning (PFP) application.

 

Release date: 10 September 2024

RamBase release info - Week 34 - 2024

27.08.2024

RamBase release info - Week 33 - 2024

20.08.2024

RamBase release info - Week 32 - 2024

13.08.2024

RamBase release info - Week 31 - 2024

06.08.2024

Finance: The new and improved Bank (BANK) application is being released

24.06.2024

Blog post added by Alberina Shala

Classification: IMPORTANT

 

RamBase will soon release the new Bank (BANK) application. This release is done as part of an ongoing initiative to enhance the classic applications with improved functionality, better overview and workflows to supplement the user experience.

These quality of life changes will be noticeable in the Bank (BANK) application:

  • All banks are now listed

  • The Main info and Key figures can now be found under the Bank account area

  • Balances, Address, Settings and Opening balances are now organized as individual tabs

While the look and feel of the application might have changed, the core functionality and logic still remains the same.

Read more about the Bank (BANK) application
Read more about how to Add new bank accounts 

Release date: 26 June 2024

Courses: Announcing the Course Calendar for Fall 2024!

18.06.2024

Blog post edited by Eli Havn

Classification:  USEFUL

 

We are excited to announce our course calendar for the fall! Whether you want to deepen your knowledge of our ERP system or enhance specific skills, we offer a variety of courses designed to meet your needs. Click the link below to explore our upcoming courses.

Course calendar - Fall 2024

Finance: The new and improved Bank (BANK) application is being released.

24.06.2024

Blog post edited by Alberina Shala

Classification: IMPORTANT

 

RamBase will soon release the new Bank (BANK) application. This release is done as part of an ongoing initiative to enhance the classic applications with improved functionality, better overview and workflows to supplement the user experience.

These quality of life changes will be noticeable in the Bank (BANK) application:

  • All banks are now listed

  • The Main info and Key figures can now be found under the Bank account area

  • Balances, Address, Settings and Opening balances are now organized as individual tabs

While the look and feel of the application might have changed, the core functionality and logic still remains the same.


Release date: 26 June 2024

RamBase release info - Week 23 - 2024

11.06.2024

RamBase release info - Week 22 - 2024

04.06.2024

RamBase release info - Week 21 - 2024

28.05.2024

RamBase release info - Week 20 - 2024

21.05.2024

RamBase release info - Week 19 - 2024

14.05.2024

RamBase release info - Week 17 - 2024

30.04.2024

RamBase release info - Week 16 - 2024

23.04.2024

RamBase release info - week 15

16.04.2024

RamBase release info - week 14

16.04.2024

RamBase release info - week 12

26.03.2024

Production: Redesigned and refined popups for release and split of Production work orders (PWO).

25.03.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

When releasing and/or splitting a Production work order (PWO), the production planner is dependent on making informed decisions and then having the right tools to act efficiently on those decisions.

To improve the user experience for the production planner, we are refining the available information, while providing a redesign of the popups for increased efficiency.

These changes will be available in the following popups in the Production work order (PWO) application:

New Split production work order popup

  • The new popup displays relevant information from the source Production work order (PWO), while at the same time allowing the user to edit the details of the potential new Production work order (PWO).

  • Two new tabs, where the user can choose to either select Product units (LCM) for split, or even more efficiently, scan serial numbers.

New Release production work order popup

  • The potential Product units (LCM) are now listed, allowing the user to individually select Product units (LCM) or use the Release remaining quantity button to release the Production work order (PWO).

While the look and feel of the popups might have changed, the core functionality of the release and split logic still remains the same.

 

Read more about the Production work order (PWO) application

 

Release date: 2 April 2024

RamBase release info - week 11

19.03.2024

Courses: Enhance Your Efficiency within Production and Procurement - Enroll Now

15.03.2024

Blog post edited by Eli Havn

Classification:  USEFUL

 

Looking to optimize your use of RamBase in production planning, production, or procurement? Here's an opportunity to elevate your skills by joining our upcoming courses in Aksdal. With our small class sizes we offer an engaging learning environment with like minded professionals.

Check out the details via the links below and secure your spot today!

May 14: Production Planning
May 15: Production
May 29: Procurement
May 30: Advanced Procurement

Production: Redesigned and refined popups for release and split of Production work orders (PWO)

14.03.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

When releasing and/or splitting a Production work order (PWO), the production planner is dependent on making informed decisions and then having the right tools to act efficiently on those decisions.

To improve the user experience for the production planner, we are refining the available information, while providing a redesign of the popups for increased efficiency.

These changes will be available in the following popups in the Production work order (PWO) application:

New Split production work order popup

  • The new popup displays relevant information from the source Production work order (PWO), while at the same time allowing the user to edit the details of the potential new Production work order (PWO).

  • Two new tabs, where the user can choose to either select Product units (LCM) for split, or even more efficiently, scan serial numbers.

New Release production work order popup

  • The potential Product units (LCM) are now listed, allowing the user to individually select Product units (LCM) or use the Release remaining quantity button to release the Production work order (PWO).

While the look and feel of the popups might have changed, the core functionality of the release and split logic still remains the same.

Read more about the Production work order (PWO) application here

 

Release date: 2 April 2024

RamBase release info - week 10

12.03.2024

Customer Event: RamBase Summit 2024 - Book Now

11.03.2024

Blog post edited by Joakim Bringedal

Classification:  USEFUL

 

We invite all RamBase users to our annual customer event on the 23rd and 24th of April, this time the place is Gdansk Poland.

Book your seat and read more about the customer event: https://www.rambase.com/rambase-summit-2024

 

The theme for this year's customer event is "Growing Stronger Together."

With this theme, we aim to highlight not only your growth through our systems but also the concept of building strength together as a network of experts.

 

What to look forward to:

  • Inspirational speakers and business discussions

  • Four parallel sessions with tailored tracks for your business interests

  • Industry insights directly from our customers

  • Discover integrations to maximize value with our systems

  • And of course, having a great time together!

Finance: The new and improved Bank statement (BST) application is being released.

07.03.2024

RamBase release info - week 9

05.03.2024

RamBase release info - week 8

27.02.2024

Finance: The new and improved Bank statement (BST) application is being released

26.02.2024

Blog post added by Alberina Shala

 Classification: IMPORTANT

 

RamBase will soon release the new Bank statement (BST) application. This release is done as part of an ongoing initiative to enhance the classic applications with improved functionality, better overview and workflows to supplement the user experience.

 

Release date: 11 March 2024

RamBase release info - week 7

20.02.2024

Production: New applications in the production module.

15.02.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

 

To enhance efficiency and overview within the production module the following improvements have been introduced:

  • The Production work order menu (PWOMENU) application

The Production work orders menu (PWOMENU) lists all Production work orders (PWO) in an easy to use interface. The new application serves as an alternative to the Production work orders (PWO) application with the added functionality of the Productions tab from the Production planning (PRODPLAN) application.

In the future, it will replace both the Production work order (PWO) and the Production planning (PRODPLAN) applications.

  • The Scheduled production jobs (SPJ) application

Handling individual Production work orders (PWO) can be time consuming. Especially if your Production work orders (PWO) have complex structures, with equally complex subproductions.

The Scheduled production jobs (SPJ) application mitigates this as it makes it easier to efficiently schedule operations on multiple Production work orders (PWO).

  • The Order overview (OOV) application

The Orders overview (OOV) application lists all open Sales order items (COAITEM) requiring a Production work order (PWO). It is an alternative to the Production backlog customer backlog (PBCOA).

The extensive filtering options allow for arranging all open Sales order items (COAITEM) according to the users' needs.

  • The Inspect subproductions (PWOTREE) application

The Inspect subproductions (PWOTREE) application is an overview application tailored for Production work orders (PWO) with subproductions. The application grants overview by displaying the subproductions in relation to a main Production work order (PWO).

The Inspect subproductions (PWOTREE) application works in the context of a Production work order (PWO) and is available in the Order overview (OOV) and Schedule production jobs (SPJ) applications.

 

Read more about Production work order menu (PWOMENU) application here

Read more about Scheduled production jobs (SPJ) application here

Read more about Order overview (OOV) application here

Read more about Inspect subproductions (PWOTREE) application here
 

Release date: Already released

RamBase release info - week 6

13.02.2024

Sales: Maintain traceability control in Project orders (POD) by requiring serial numbers for consumption of material.

08.02.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

The purpose of the Project order (POD) application is to have a tool that can be used to provide a cost/price estimate in advance, and a place to log hours and to follow up logistics after a project order has been started.

RamBase will expand the functionality of the Project order (POD) application by adding a new feature to increase traceability control.

The feature includes the option of setting a requirement that all material, which are consumed in a Project order item (PODITEM), must be added a serial number.

A created Project order item (PODITEM) will inherit the selection from the Require serial number before shipping checkbox, which is set in the Product (ART) application. Note that the option of overruling this selection will be available in the Project order item (PODITEM) application.

The users can scan serial numbers when picking with the Pick (PODPICK) application with a hand held terminal, or with the RamBase mobile application for Project order (POD). The user can also use the desktop application.

For Project order items (PODITEM) requiring serial numbers, a validation will be made when confirming consumption of material. This is to check if the serial number requirement is fulfilled. If not, the user will not be allowed to confirm the consumption.

 

Please note that this new feature will only be valid for Project order items (PODITEM) that are created after release, and it will have no impact on existing Project order items (PODITEM).

 

Read more about Requiring serial numbers for consumed material in a Project order (POD) here

 

Release date: 12 February 2024

RamBase release info - week 5 -

06.02.2024

RamBase release info - week 4 -

30.01.2024

Sales: Maintain traceability control in Project orders (POD) by requiring serial numbers for consumption of material

29.01.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  IMPORTANT

 

The purpose of the Project order (POD) application is to have a tool that can be used to provide a cost/price estimate in advance, and a place to log hours and to follow up logistics after a project order has been started.

RamBase will expand the functionality of the Project order (POD) application by adding a new feature to increase traceability control.


The feature includes the option of setting a requirement that all material, which are consumed in a Project order item (PODITEM), must be added a serial number.

A created Project order item (PODITEM) will inherit the selection from the Require serial number before shipping checkbox, which is set in the Product (ART) application. Note that the option of overruling this selection will be available in the Project order item (PODITEM) application.

The users can scan serial numbers when picking with the Pick (PODPICK) application with a hand held terminal, or with the RamBase mobile application for Project order (POD). The user can also use the desktop application.

For Project order items (PODITEM) requiring serial numbers, a validation will be made when confirming consumption of material. This is to check if the serial number requirement is fulfilled. If not, the user will not be allowed to confirm the consumption.

Please note that this new feature will only be valid for Project order items (PODITEM) that are created after release, and it will have no impact on existing Project order items (PODITEM).

Read more about the Project order (POD) application here

 

Release date: 12 February 2024

Admin: Monitor your company output with the new Jobs (JOBS) application

25.01.2024

Blog post added by Knut Sætre Waka (Deactivated)

Classification:  USEFUL

 

The new Jobs (JOBS) application will grant you full output control by allowing you to quickly check on your output jobs or the progress of report jobs.

The application is especially useful for users with the role of Output administrator, who can verify that only requisite report jobs are running, in doing so optimizing the system and controlling the information being exported.

 The Jobs (JOBS) application is divided into four tabs:

  • My output jobs - Available to all users. This tab is for checking your output jobs. Notable functionality is located in the ​Download​​ column where an attached document can be downloaded. An output job can also be cancelled or repeated by clicking the icons in the right most column.

  • All output jobs - Available to users with the role Output administrator. This tab will list all output jobs, for all users.

  • My report jobs - Available to all users. This tab will list all report jobs as either a print or email output. The output jobs can quickly be filtered by selecting the predefined filters ​Exclude recurring jobs​ or ​Show only recurring jobs​​.

  • Recurring report jobs - Available to users with the role Output administrator. This tab is used to quickly identify that only wanted report jobs are running on an interval. This will allow the system to run as efficiently as possible. It can also be beneficial to manage what is being exported of your company’s information.

Note that report jobs which are activated by users without the required permissions, or by users that have been deactivated, will automatically be set in Status 6 - Unscheduled by system.

Jobs JOBS.png

Read more about the Jobs (JOBS) application here

 

Release date: Already released

RamBase release info - week 3

23.01.2024

RamBase release info - week 2

16.01.2024

RamBase release info - week 1

09.01.2024

RamBase release info - week 52

03.01.2024

Finance: Bloomberg will no longer be used as a currency source in RamBase.

27.12.2023

Blog post added by Eli Havn

Classification:  IMPORTANT

 

As Bloomberg will no longer serve as a currency source in RamBase, customers currently using Bloomberg as their primary or secondary currency will be switched to alternative sources. The new source for currency exchange rates will be selected based on the country code of each company's database. For instance, for Norway (NO), the primary source will be Norges Bank, and the secondary source will now be Xignite, our new currency exchange rate provider.

 

This table displays various configurations for primary and secondary rate sources:

Country (Code)

Primary RateSource

Secondary Rate Source

Norway (NO)

Norges Bank

Xignite

Sweden (SE)

Sveriges Riksbank

Xignite

Poland (PL)

Nardowy Bank Polski

Xignite

Europe

European Central Bank

Xignite

Other

Xignite

European Central Bank

 

All sources are currently accessible to customers, allowing the switch to be completed at this time if preferred. To implement the change now, or for any inquiries or additional clarification needed, feel free to contact your support provider. In the event the change has not been initiated by January 1, the adjustment will be made automatically.

 

Read more about rate source here

 

Release date: 1 January 2024

RamBase release info - week 50

18.12.2023

RamBase release info - week 49

11.12.2023

Finance: Bloomberg will no longer be used as a currency source in RamBase

06.12.2023

Blog post edited by Eli Havn

Classification:  IMPORTANT

 

As Bloomberg will no longer serve as a currency source in RamBase, customers currently using Bloomberg as their primary or secondary currency will be switched to alternative sources. The new source for currency exchange rates will be selected based on the country code of each company's database. For instance, for Norway (NO), the primary source will be Norges Bank, and the secondary source will now be Xignite, our new currency exchange rate provider.

 

This table displays various configurations for primary and secondary rate sources:

 

Country (Code)

Primary RateSource

Secondary Rate Source

Norway (NO)

Norges Bank

Xignite

Sweden (SE)

Sveriges Riksbank

Xignite

Poland (PL)

Nardowy Bank Polski

Xignite

Europe

European Central Bank

Xignite

Other

Xignite

European Central Bank

 

All sources are currently accessible to customers, allowing the switch to be completed at this time if preferred. To implement the change now, or for any inquiries or additional clarification needed, feel free to contact your support provider. In the event the change has not been initiated by January 1, the adjustment will be made automatically.

 

Read more about rate source here

 

Release date: 1 January 2024

RamBase release info - week 48

04.12.2023

Sales: Change in how expenses are logged for project orders.

04.12.2023

Blog post added by Eli Havn

Classification:  IMPORTANT

 

RamBase is introducing a change in how expenses are logged for project orders. Project order items which enable manually update of accrued numbers will be replaced by items which calculate numbers based on expense logs.

 

Previously, expenses could only be added as a quantity of 1. The introduction of expense logs allows users to estimate and log any quantity for these project order items, and cost and sales will automatically be calculated based on this information. For example, when recording mileage allowance as an expense, users may log their mileage day by day. Cost and sales for this project order item will then be calculated automatically based on these logs.

 

The use of expense logs will enhance accuracy, traceability, and transparency. It contributes to accuracy by providing more comprehensive information, aids traceability by offering a clearer history of expenditures, and promotes transparency by allowing for a more detailed breakdown of the costs involved.

 

Expense logs may be added to a project order item directly from the Project order item (PODITEM) application or from the new Expense log (EXL) application, both in the desktop version, as well as the Rambase mobile application.

 

Users can process and finalize existing project order items that enable manual update of accrued expenses. However, they will not be able to create new ones after the release.

 

Read more about expense logs here

 

Release date: 6 December 2023

QHSES: New version of the Quality issue (QIS) application.

28.11.2023

Blog post edited by Eli Havn

Classification:  IMPORTANT

 

The Quality issue (QIS) application is soon to be introduced as two separate applications:

  • The Quality issue list (QIS) application and

  • The Quality issue details (QISD) application

 

Users will still find all existing functions and features, but the improved user interface will make the work on quality issues in RamBase more intuitive and user-friendly.

 

When entering the Quality issue list (QIS) application, users will see a list of quality issues and have extensive filtering options. Selecting an issue from the list, or creating a new quality issue, will take the user to the quality issue in the Quality issue details (QISD) application.  

 

The Quality issue details (QISD) application is where quality issues are processed. It will have a clearer flow than the previous Quality issue (QIS) application. In addition, it will offer several options of how to navigate back and forth between the different parts of the process.

 

In the Quality issue details (QISD) application, users will also notice a new grey area added to the right of the working area. (This stays the same for the whole process.) The default Summary tab gives an overview of information given in all parts of the process. Tabs for Log, Notes and Mail are also on-hand throughout the different phases of processing the quality issue.   

 

The mobile application will also be improved, and it will be possible to add pictures and source data when creating a quality issue via the mobile application.

 

See how the new quality issue applications work in this film

Read more about the The Quality issue list (QIS) application here

Read more about the The Quality issue details (QISD) application here

 

Release date: 30 November 2023

RamBase release info - week 47

27.11.2023

Sales: Change in how expenses are logged for project orders

22.11.2023

Blog post added by Eli Havn

Classification:  IMPORTANT

 

RamBase is introducing a change in how expenses are logged for project orders. Project order items which enable manually update of accrued numbers will be replaced by items which calculate numbers based on expense logs.

 

Previously, expenses could only be added as a quantity of 1. The introduction of expense logs allows users to estimate and log any quantity for these project order items, and cost and sales will automatically be calculated based on this information. For example, when recording mileage allowance as an expense, users may log their mileage day by day. Cost and sales for this project order item will then be calculated automatically based on these logs.

 

The use of expense logs will enhance accuracy, traceability, and transparency. It contributes to accuracy by providing more comprehensive information, aids traceability by offering a clearer history of expenditures, and promotes transparency by allowing for a more detailed breakdown of the costs involved.

 

Expense logs may be added to a project order item directly from the Project order item (PODITEM) application or from the new Expense log (EXL) application, both in the desktop version, as well as the Rambase mobile application.

Users can process and finalize existing project order items that enable manual update of accrued expenses. However, they will not be able to create new ones after the release.

 

Read more about expense logs here

 

Release date: 6 December 2023

RamBase release info - week 46

20.11.2023

QHSES: New version of the Quality issue (QIS) application

16.11.2023

Blog post added by Eli Havn

Classification: IMPORTANT

 

The Quality issue (QIS) application is soon to be introduced as two separate applications:

  • The Quality issue list (QIS) application and

  • The Quality issue details (QISD) application

 

Users will still find all existing functions and features, but the improved user interface will make the work on quality issues in RamBase more intuitive and user-friendly.

 

When entering the Quality issue list (QIS) application, users will see a list of quality issues and have extensive filtering options. Selecting an issue from the list, or creating a new quality issue, will take the user to the quality issue in the Quality issue details (QISD) application.  

 

The Quality issue details (QISD) application is where quality issues are processed. It will have a clearer flow than the previous Quality issue (QIS) application. In addition, it will offer several options of how to navigate back and forth between the different parts of the process.

 

In the Quality issue details (QISD) application, users will also notice a new grey area added to the right of the working area. (This stays the same for the whole process.) The default Summary tab gives an overview of information given in all parts of the process. Tabs for Log, Notes and Mail are also on-hand throughout the different phases of processing the quality issue.   

 

The mobile application will also be improved, and it will be possible to add pictures and source data when creating a quality issue via the mobile application.

 

Release date: 30 November 2023

RamBase release info - week 45

13.11.2023

RamBase release info - week 44

07.11.2023

RamBase release info - week 43

30.10.2023

RamBase release info - week 42

23.10.2023

Logistics: Rental function to be removed from the Scanpick (SCANPICK) application.

23.10.2023

RamBase release info - week 41

26.10.2023

Admin: Approvals (APPROVAL) application updated with extensive filtering options and much more.

12.10.2023

Blog post edited by Alberina Shala - "Version published as blog"

Classification: IMPORTANT

 

A new version of the Approvals (APPROVAL) application will be released soon. It gives a good overview of items in need of approval, or that have been sent for approval, all in one place. In other words, Purchase orders, Supplier invoices and so on, all at a glance.

 

There are extensive filtering options to ensure that it is easy to find relevant items for approval. Attachments may be previewed without further clicking and lists may be exported to Excel. The application also makes it easy to process items, as it has options to approve/reject one at a time, or in bulk.

 

A daily e-mail will be sent to each user with a summary of approvals pending the user's review. When an approval is marked as "urgent", an e-mail will be sent to the user immediately. This will replace the use of Internal message Service (IMS) notifications.

 

Read more about the Approvals (APPROVAL) application here

 

Release date: 16 October 2023

Logistics: Rental function to be removed from the Scanpick (SCANPICK) application

11.10.2023

RamBase release info - week 40

09.10.2023

RamBase release info - week 39

02.10.2023

Admin: Approvals (APPROVAL) application updated with extensive filtering options and much more

02.10.2023

Blog post added by Eli Havn

Classification: IMPORTANT

 

A new version of the Approvals (APPROVAL) application will be released soon. It gives a good overview of items in need of approval, or that have been sent for approval, all in one place. In other words, Purchase orders, Supplier invoices and so on, all at a glance.

 

There are extensive filtering options to ensure that it is easy to find relevant items for approval. Attachments may be previewed without further clicking and lists may be exported to Excel. The application also makes it easy to process items, as it has options to approve/reject one at a time, or in bulk.

 

A daily e-mail will be sent to each user with a summary of approvals pending the user's review. When an approval is marked as "urgent", an e-mail will be sent to the user immediately. This will replace the use of Internal message Service (IMS) notifications.

 

Read more about the Approvals (APPROVAL) application here

 

Release date: 16 October 2023

Client framework: Old Context menu now to be fully replaced by new Context menu

25.09.2023

Blog post added by Eli Havn

Classification:  USEFUL 

The old Context menu will now be fully replaced by the new Context menu (released two years ago). This means that the Show new context menu option will no longer be available via the Account option in the Toolbar.

 

In Account, the PER image will be moved to the top right corner and replace the User profile icon, if the user has an image in RamBase. If there is no image, the User Profile icon will continue as before.

 

Read more about the Context menu here

 

Release date: 27 September 2023

RamBase release info - week 38

25.09.2023

RamBase release info - week 37

18.09.2023

RamBase release info - week 34

28.08.2023

RamBase release info - week 33

21.08.2023

RamBase release info - week 32

14.08.2023

Authorized Subcontractors list updated with new changes

10.07.2023

Blog post edited by Eli Havn

Classification:  USEFUL

 

As per the RamBase Data Processing Terms, customers will receive notifications whenever changes are made to the Authorized Subcontractors list:

  • New subcontractor: ValueAdd sp.z o.o.

  • Removed subcontractor: Fabres

  • Changes: Zdata changed name to Aritma AS

  • Changes: Consignor changed name to nShift AS

  • Changes: Jakob Hatteland Solutions changed name to EMP Secure AS

 

Link to both the RamBase Data Processing Terms and Authorized Subcontractors list can be found on the RamBase website: RamBase Trust Center

RamBase release info - week 27

10.07.2023

RamBase release info - week 25

26.06.2023

RamBase release info - week 24

19.06.2023

Finance: The new and improved General ledger postings (ATR) application is being released (new release date).

13.06.2023

Blog post added by Eli Havn

Classification:  IMPORTANT

 

RamBase will release the new General ledger postings (ATR) application. This is done as part of an ongoing initiative to enhance the classic applications with improved functionality and workflows to supplement the user experience.

 

Release date: 15 June 2023

RamBase release info - week 22

05.06.2023

Finance: The new and improved General ledger postings (ATR) application is being released (new release date)

13.06.2023

Blog post edited by Eli Havn

Classification:  IMPORTANT

 

RamBase will release the new General ledger postings (ATR) application. This is done as part of an ongoing initiative to enhance the classic applications with improved functionality and workflows to supplement the user experience.

 

Release date: 15 June 2023

RamBase release info - week 21

30.05.2023

RamBase Finance Module Course

30.05.2023

Blog post edited by Joakim Bringedal

We are excited to invite you to attend the Finance Module Course, scheduled to take place on June 13-14 at the RamBase offices at Eikeskog 16, Aksdal.

In this course, you will gain comprehensive knowledge and skills to enhance your understanding of the Finance module in RamBase. The course will cover various important topics that are crucial for effectively managing financial processes within the system.

Key Details:

  • Course: Finance Module Course

  • Dates: June 13-14

  • Duration: Two days

  • Price: 9800 NOK (excluding VAT)

To register for the course or to obtain further information, please visit the course website: Finance Course Website

If you believe that this course could benefit other colleagues within your organization, we kindly encourage you to share this invitation with them.

Thank you for your attention, and we eagerly look forward to your participation in the Finance Module Course.

QHSES: New risk assessment possibilities

23.05.2023

Blog post added by Alberina Shala

Classification:  USEFUL

 

The Quality (QHSES) module has been extended to include a risk assessment submodule. From various applications in RamBase, users may now initiate a risk assessment or register risks directly linked to RamBase documents via a new icon in the top toolbar.

A range of new and useful widgets may be added to the user's Home or QHSES desktop for easy overview of operational risks.

QHSES setup (QISADMIN) has been given an upgrade, which makes it possible to add both positive and negative consequences (opportunities/risks). The assessment matrix can be adjusted to fit specific needs.

 

Read more about the risk assessment possibilities here

Read more about the setup for risk assessment in the QHSES setup (QISADMIN) application here

 

Release date: Already released

RamBase release info - week 20

22.05.2023

RamBase release info - week 19

15.05.2023

RamBase release info - week 18

08.05.2023

RamBase release info - week 17

02.05.2023

RamBase release info - week 16

24.04.2023

Finance: Enhanced view of tree structure in Charts of accounts (ACC)

21.04.2023

Blog post added by Eli Havn

Classification:  USEFUL

 

Users may get a better overview of accounts and their sub accounts by clicking a new icon that has been added in the Charts of Accounts area. Clicking this new icon allow users to drill down through the account structure for an easy overview and access to the sub accounts. In addition, the tree structure in the Charts of accounts (ACC) application is now visible at the top of the Account info area.

Note that the tree structure functionality on GL accounts has to be active in the Company settings (CSV).

 

Release date: 25 April 2023

Logistics: There is implemented a solution that enables the users to move a specified stock quantity from one product to another

20.04.2023

Blog post added by Alberina Shala

Classification:  USEFUL

There is implemented a solution so that the user can change product of existing stock. In practice that means to move part of a Goods reception item (SSAITEM) to a new Goods reception item (SSAITEM) with another product id.

A stock quantity can be moved from one given product to another, for example from product A to product B. If a deviation occurs on product A, causing it not to fulfill certain requirements, a specified stock quantity can be moved from product A to product B due to more lenient requirements. It will then be used as product B. Moving stock from one product to another is only available for stock of type Part or Material.

Read more about how to move product in stock to another product here

 

Release date: 24 April 2023

Finance: Possible to choose which dimensions to copy when using Copy GL account, dimensions and VAT

20.04.2023

Sales: Customer name in Project order (POD) has been split into FirstName and Name

20.04.2023

Blog post added by Eli Havn

Classification:  USEFUL

 

Both fields are available as columns in the Project order area and may also be used as filters.

 

Release date: 24 April 2023

Production: New Product marking template (PMT) application

20.04.2023

Blog post edited by Alberina Shala

Classification:  USEFUL

 

Product marking template (PMT) is used as a tool to generate text to mark product units during production. 
The Product marking template (PMT) will automatically build a marking text for a product unit using the template created for a product. Users can create a template with usage of parameters to be replaced by fields from RamBase.

The marking text created from the template can be found in the Marking field in the Life cycle management (LCM) application and the whole template can be found from the Product marking specification context menu in the Work order operation (WOO) application.

 

Read more about the Product marking template (PMT) application here

 

Release date: Already released

Production: New field when clicking the On hold button in the Work order operation (WOO) application

18.04.2023

Blog post added by Alberina Shala

Classification:  USEFUL

 

The new field Caused by gives you two new options to choose from when putting a Work order operation (WOO) on hold, which are Us and Customer. These options indicate whether the Work order operation (WOO) has been put on hold by either the company or the customer. You will get a description of when it was set on hold, by whom, why and whether it was by a customer or us.

 The Caused by field can also be found in the Production work order (PWO) and Planned service operations (SVC) applications.

Read more about the Work order operation (WOO) application here

 

Release date: 20 April 2023

Sales: New widget called My project order work log summary is available soon

17.04.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

The new My project order work log summary widget will present the hours the user has worked. It is split between Today, Yesterday, Previous week and This week.

The total of logged hours for Today, Yesterday, Last week and This week for the supplied filter is visible in the bottom of the Work log (WOL) application.

Read more about widgets here

 

Release date: 19 April 2023

Sales: New option to add item to an existing sales order when creating a Sales order (COA) from the Sales forecast (FCC) application

14.04.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

The new feature allows the user to create a new sales order or add item to an existing sales order when using the Create sales order icon in the Sales forecast (FCC) application.

 

Release date: 18 April 2023

Finance: Supplier bank accounts can now be discontinued in the Supplier (SUP) application

13.04.2023

Blog post added by Alberina Shala

Classification:  USEFUL

A new change in the Supplier (SUP) application allow users to discontinue a supplier bank account by clicking the Discontinue supplier bank account button in the existing Edit bank account popup.

If a bank account is discontinued, it cannot be used in the remittance process. A validation during the remittance process in Pay management (PAM) has been implemented to check if the bank account is active before proceeding. A validation is also implemented in the Received supplier invoice and credit note (ISI) application through a Note to check if the supplier bank account is active.

Read more about the Supplier (SUP) application here

 

Release date: 17 April 2023

Sales: Discount percentage can now be entered in the process of creating Sales order and Sales quote items (COAITEM/CQUITEM)

11.04.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

The new Discount percentage field is available in the Create new item popup when creating new Sales order and Sales quote items (COAITEM/CQUITEM).

 

Release date: 13 April 2023

Finance: New setting available in the Received supplier invoice/credit note (ISI) application: Only create PDF if no attachments are included in the PEPPOL XML file

11.04.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

The new Company setting (CSV), (ISI) Create PDF only if no attachments exists is available. The new setting is a sub setting of the (ISI) Create PDF for received supplier invoice setting.

If this setting is activated and no attachment is included in the PEPPOL XML file, RamBase creates a PDF document of the invoice based on the PEPPOL XML file

Read more about the Received supplier invoice/credit note (ISI) application here

 

Release date: 13 April 2023

Sales: More flexibility in the Customer reference field

11.04.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

The Customer reference field has been changed in applications for sales transactions. It is now possible to select an existing contact person from the customer. Free text may still be added, if preferred.

 

Release date: 13 April 2023

Sales: It will soon be possible to add a team of employees to a Project order (POD)

04.04.2023

Blog post added by Alberina Shala

Classification:  USEFUL

 

A feature will soon be implemented to add a team of employees to a Project order (POD).
The previous Responsible field will be replaced by Project manager, and a new Project members field. In the Project member field, one may add as many employees as needed.

The filter My project orders in the filter builder will include all the Project orders (POD) which the user is a member of or manager for.

Read more about the Project order (POD) application here

 

Release date: 11 April 2023

Logistics: New Picking list (PIL) application for handheld terminals

30.03.2023

Blog post added by Alberina Shala

Classification:  USEFUL

 

A new Picking list (PIL) application for handheld terminals will show picking lists for all Shipping advices (CSA), Supplier returns (SRT) and Goods transfers (STW) which are ready to be picked. The user can navigate directly to the Scanpick (SCANPICK) application from the Picking list (PIL) application or print a picking list, if required. This may be useful to use as a picking queue instead of a paper stack of picking lists. Users should be aware that the customer or supplier name/id will not be available in the list.

 

Read more about picking with handheld terminal (SCANPICK) here

 

Release date: 3 April 2023

Finance: Changes to the Fixed assets (FAR) application and reports to show both original and current investment amount

29.03.2023

Blog post added by Joakim Bringedal

Classification:  USEFUL

 

After a Fixed asset (FAR) has been registered and depreciation has started, the investment amount for the fixed asset can be adjusted using the Make Adjustment to Depreciation Plan option in the action menu. When the adjustment has been registered, the investment amount, balance and depreciation amounts will change for the fixed asset.

We have now made a change to the Fixed asset (FAR) application and some reports, to show both the original and the current investment amount. This will give a better overview of which fixed assets have been adjusted, and the reports will make it easier to find the total adjustment amounts for all fixed assets.

These fixed assets reports have been adjusted to show both the original and current investment amount (Report number - Name):

REP/101153 - Fixed Assets : Investment Amount, Period Depreciation, Total Depreciation and Balance.

REP/104445 - Fixed Assets. Investment Amount, Depreciation this year & last years and Balance.

REP/104453 - Fixed Assets. Investment Amount, Depreciation this year & last years and Balance.

REP/103624 - Fixed Assets. Investment Amount, Depreciation this year & last years and Balance.

REP/101150 - Fixed Assets : Investment Amount, Period Depreciation, Total Depreciation and Balance.

REP/100326 - Fixed Assets : Investment Amount, Balance, Depreciation this year & last years.

REP/100322 - Fixed Assets : Balance & Prognosis for 12 months.

REP/100316 - Fixed Assets : Balance & Prognosis for 12 months.

REP/100264 - Fixed Assets : Investment Amount, Period Depreciation, Total Depreciation and Balance.

REP/100263 - Fixed Assets : Investment Amount, Period Depreciation, Total Depreciation and Balance.

Read more about the Fixed asset (FAR) application here

Release date: 30 March 2023

Finance : New and adjusted functionality for making adjustments to fixed assets depreciation plan

28.03.2023

Blog post added by Alberina Shala

Classification:  USEFUL

 

Closing line in depreciation plan:

When a Fixed asset (FAR) is registered and depreciation has started, we have a new option in the context menu: Close earlier Depreciation and handle in this period. This context menu option can be used if fixed assets depreciation has not been done in one or more previous periods, and the total of the depreciations left behind should be added to the current period. All depreciations from earlier periods which have no GL postings for depreciation will then be closed and added to the planned depreciation amount for current (highlighted) period, in Status 0.

Adjusting investment amount, balance and depreciation amounts:

We have also made some changes to the context menu option Make Adjustment to Depreciation Plan. This option will now support two different methods for creating adjustments:

  • Adjust remaining plan - The revision of the asset affects future depreciation schedules.

  • Current Period - The depreciation of the asset to date is re-evaluated based on revised values, and any variance between the newly calculated depreciation and the previously posted depreciations is recorded in the present accounting period.

The context menu option Make Adjustment to Depreciation Plan will show a popup where some fields need to be updated. Some changes have been made to this popup, to improve the functionality and to support the two different methods. Before adjustments are done, Adjustment amount field in the popup should be filled in, the Adjustment method must be selected, and a Note can be added so that the depreciation plan will show why this adjustment was done. When adjustment is confirmed, the depreciation plan will be regenerated and a new adjustment line, with a date for the adjustment and a reference to user id, will be added to the depreciation plan.

 

Read more about the Fixed assets (FAR) here

 

Release date: 30 March 2023